The three leaks on 4rth Street and Main Ave area of the park have been repaired. Work crews are expected to return tomorrow (Tuesday 9/7/2021) to repair the broken pavement in the road and residents driveways. To prevent future breaks in the underground pipes,Vice President Mark Jozapaitis spoke with the contractor about installing some form of barrier to prevent parking in the empty lots. It is suspected that cars parked on those areas my be cracking the buried water pipes.
Sep
06
Comments are closed.